J. Cumby Construction has been contracted by Fayetteville Public Works Commission to install a New Equalization Tank-consisting of a 2.5M Gallon Pre-stressed Concrete Storage Tank that’s 150 feet in diameter.

Moreover, J. Cumby will also be adding Flow Control Facilities that include a 36’ deep concrete pump station with a grinder pump, sump pump, pump, wet well and dry well; as well as, a 23’ deep concrete diversion structure with slide gates, weir gates and a vertical mounted deflection screen and much more.

Additionally, there will be approximately 700 LF of new 8” portable water line to be installed down ‘George Owen Road’, to feed the new pump station and equalization tank. There will also be approximately 320 LF of new 42” PVC station influent/effluent piping and precast manholes, that will tie into the existing 42” sewer line.

PROJECT INFORMATION:

  • Location: Fayetteville, NC

  • Date Completed (Estimated): April, 2022

  • Contract Value of $11,170,00+

  • Owner: Fayetteville Public Works Commission

  • Engineer: CDM Smith

NOTABLE SPECS:

  • This site is a “Green Field Construction” since a significant amount of clearing and grubbing had to be completed in order to be able to begin on the EQ Tank

  • There will be approximately 700LF of 8” portable water line installed

  • There will be approximately 320 LF of 42” PVC station influent/effluent piping and precast manholes tied into the preexisting sanitary sewer line