A new submersible sewage pump station located on the same sites as the existing Mayberry Street lift station, South Carter Street lift station, and Turn Table Road lift station. The scope of work included submersible sewage pumps, a wet well, cementitious waterproofing, valves, valve vault, surge valve, flow meter, meter vault, yard piping, demolition of existing lift station, connection to existing wet well, electrical work, restoration, site work, and all related appurtenances for new, complete and operable pump stations.

Project Specs:

  • Location: Sparta, TN

  • Start Date:  March 2014

  • Completion Date: May 2015