Viewing entries in
Commercial

Lebanon ATAD Roof Replacement

Lebanon ATAD Roof Replacement

Roofing replacement for 3ea ATAD Reactor Tanks

Major Activities:

  • Existing Roof & Parapet Demo

  • Concrete Parapet Replacement

  • Roof Balanst Slab

  • EPDM Roofing Replacement

PROJECT INFORMATION:

  • Location: Lebanon Wastewater Treatment Plant, Lebanon TN

  • Date Completed (Estimated): November 2024

  • Contract Value of $962,000.00

  • Owner: City of Lebanon

  • Engineer: Water Management Services

Tennessee Heart MEDICAL FACILITY ADDITION

Tennessee Heart MEDICAL FACILITY ADDITION

Constructing a 16,000-sf new medical office and rehab facility with an 1,800-sf enclosed connecting bridge.


Project Specs:


Location: Cookeville, TN


Date Completed (Estimated): May 2025


Contract Value: 6.5MM


Owner: Cookeville Cardiovascular Realty


Designer: AEI


Crossville Ceramics Ball Mill Addition

Crossville Ceramics Ball Mill Addition

New 8,600 square foot pre-engineered metal building addition with 2 each new cast in place concrete tanks and foundation work for future Ball Mill.

PROJECT INFORMATION:

  • Location: Crossville, TN

  • Completion Date: January 2024

  • Contract Value $2.4

  • Owner: Crossville Ceramics, Inc

  • Engineer: Bouton Engineering

NOTABLE SPECS:

  • New building has 55’-0” heights.

Timberwalk Subdivision

Timberwalk Subdivision

Timberwalk Subdivision is a 292 lot subdivision development in Cookeville TN. Major activities include grading, utility installation, HOA/Community, pool, parks and buildings, etc.. streets, city sewer infrastructure extension.

Project Information:

  • Location: Cookeville, TN

  • Date Completed (Estimated): October 2025

  • Contract Value of $13,101,200

  • Owner: Titan Development

  • Engineer: Clinton Engineering

10st Street Widening and Food City

10st Street Widening and Food City

J. Cumby Construction will be site grading and implementing utility infrastructure improvements for the multi-site commercial business development, located at the intersection of 10th Street and Old Kentucky Road, that features a Food City.

Furthermore, this site will require the relocation of City Utility infrastructure and a five-lane road widening project.

PROJECT INFORMATION:

  • Location: Cookeville, TN

  • Date Completed (Estimated): September, 2021

  • Contract Value of $1,878,000+

  • Owner: BSM Cookeville, LLC

  • Engineer: Clinton Engineering Services, LLC

NOTABLE SPECS:

  • Multi-site commercial business development to a future Food City location.

  • Major City utility infrastructure relocation

  • Five-lane Street Widening

Fall Creek Falls Bridge Replacement

Fall Creek Falls Bridge Replacement

In an effort to ensure the continued safety and quality experience for the visitors of one of Tennessee’s most popular state parks, The State of Tennessee, selected J. Cumby Construction to replace and improve two, forty years old, wooden suspension bridges, along with their associated trails.

The new Fall Creek Falls Nature Center Bridge features tower suspended cables crossing approximately 200 feet over the Cane Creek waterway and allows guests to access the Woodland and Gorge Overlook Trails that lead to the Fall Creek Falls that, at 256 feet tall, are the tallest free falling falls east of the Mississippi. The Piney Falls bridge required anchoring into the existing bridge footprint on the cliff edge and spans approximately 60 feet over the Piney Creek waterway and is part of the Lower Loop and Piney Falls Trail systems.

PROJECT INFORMATION:

Location: Spencer, TN

Date Completed: January 2021

Contract Value of: $1,663,000+

Owner: State of TN, Dept. of General Services Real Estate Asset Management (STREAM) for Dept. of Environment and Conservation.

Engineer: AECOM

Phi Gamma Delta Fraternity House

Phi Gamma Delta Fraternity House

Tech Fiji Inc. has contracted J. Cumby Construction to completely demolish and replace their aging, near seventy-year-old fraternity house.

The contracted work is to take place over the span of one academic year and will include six bedrooms, two studies, five restrooms, a chapter room, storage room, loungeroom and etc. This fraternity house will be approximately 6,135 square feet by the completion of the project.

PROJECT INFORMATION:

  • Location: Cookeville, TN

  • Completion Date (Estimated): August, 2021

  • Contract Value $1,218,000+

  • Owner: Tech FIJI, Inc

  • Engineer: Jonathan Miller Architecture & Design

NOTABLE SPECS:

Fraternity House Specs:

  • 6,135 sqft

  • Complete Demo/Rebuild of the house

  • 6 Bedroom, 5 Bathroom

Tennessee Tech University- Roaden University Center

Tennessee Tech University- Roaden University Center

As one of more than a dozen concurrent projects totaling over $180,000,000, J. Cumby completed a 11,500 square feet, multi-floor, addition to the Roaden University Center building featuring interior lounges, dining space, and covered porches. Also included in the scope of work were renovations to 9,300 square feet of interior space to include the Multi-purpose room, cafeterias, and passageways.

Due to the interior renovations, utilities updates and Tennessee Technological University’s development plan, the construction was phased to limit interruption to existing facilities, and to coordinate with continued work on surrounding areas and projects.

Project Specs:

Location: Cookeville, TN

Date Completed: May 2019

Contract Value of: $6,700,000+

Owner: Tennessee of Regents

Engineer: Sparkman & Associate Architects

White County Athletic Complex

White County Athletic Complex

To expand the White County School System athletic program’s competitive fields capacity and improve existing facilities, J. Cumby Construction was selected to complete a new athletic complex at the White County Middle School. The expanded facilities provide baseball, softball, and soccer fields for the Middle School’s primary use as well as allowing overflow capacity for White County High School during tournaments. Also included onsite is a High School football practice field.

The project consisted of a new access road surrounding the school for drop-off and pick-up traffic, parking lot, complex-wide fencing, multi-purpose building, as well as the four athletic fields with associated structures. Notable features of work included athletic field lighting by Musco, precision laser grading, rainmaker irrigation system, ten structures site wide, and athletic fencing and equipment.

Project INFORMATION:

Location: Sparta, TN

Date Completed: January 2020

Contract Value of: $3,700,000+

Owner: White County School District

Engineer: The Lewis Group Architects Inc., P.C.

NOTABLE SPECS:

  • 15+ Acre & 31,000 CY Excavation

Heraeus Plant Expansion

Heraeus Plant Expansion

 30,000 SF expansion to the Heraeus Metal Management Processing Plant in Wartburg, TN.

Macon County High School Corridor/Connector

Macon County High School Corridor/Connector

  Due to high wind and storm damage, and to provide protection against the elements, the Macon County Board of Education contracted J. Cumby Construction to construct an enclosed corridor between the school and gym buildings at the Macon County High School. The conditioned corridor consisted of a metal structure with a membrane roof and aluminum store front walls. A new entry lobby, constructed to enclose the gym entrance and ticketing area which the corridor connected to, as well as an expansion to the existing cafeteria were also included in the project scope.

Project Specs:

  • Location: Lafayette, TN

  • Completion Date: March 2019

  • $794,000+ Contract Value

Kerry Ingredients Plant Expansion

Kerry Ingredients Plant Expansion

To increase production capacity and provide capital improvements, Kerry Ingredients, Inc. contracted J. Cumby Construction to Expand their Liquid Smoke manufacturing plant in Monterey, TN. Included in the scope was the construction of a new truck scale, a replacement of the truck ramp, dump, and hopper structures, a sawdust storage silo, various improvements to site structures, significant soil remediation, and four new building structures to include, an electrical building, control room, burner equipment building, and wet storage tank building.

Project Specs:

  • Location: Monterey, TN

  • Completion Date: May 2019

  • $3,200,000+ Contract Value

  • Owner: Kerry Ingredients & Flavours

  • Bouton Engineering, Gary Bouton

Notable Specs

  • 2,100 CY of Concrete

  • 18,000 Tons of Stone

Tigar International Project

Tigar International Project

A new construction project for Tigar International to include ample warehouse space for product distribution and adequate office space.

Tenneco Automotive Warehouse Addition

Tenneco Automotive Warehouse Addition

The design-build warehouse addition at Tenneco Automotive in Smithville, TN created additional space for storage of new automotive parts manufactured at the facility, a new dock area for shipping products, and access to the new facilities.

TTU Jobe/Murphy Residence Hall Upgrade

TTU Jobe/Murphy Residence Hall Upgrade

The Jobe/Murphy Residence Hall Upgrade was a complete renovation of two dorm facilities on the campus of Tennessee Technological University. 

Doctors Boyd Medical Facility

Doctors Boyd Medical Facility

This new construction of an Optometry office for Drs. Zach & Lori Boyd focuses on offering more room for patients before, during, and after their examinations.