Water Treatment Plant addition of Sedimentation/Flocculation Basin, Sludge Pump Station, modifications to existing raw water basins; meter vault, 16” raw water line, 8” basin drain line, 2'“ water line Major Activities: Cast-in-place concrete for sedimentation basin. Process piping ductile iron pipe and valves. Yard piping ductile iron pipe and valves. Tube settlers and trough system. Mechanical flash mixers. Vertical paddle flocculation equipment. Submersible feedwater pumps. Sludge pump station. Adjustable speed submersible mixers. Stainless steel gates. New electrical building. Instrumentation and Control for sedimentation basin. Upgrade to existing PLC.

Project Specs:

Location: Oneida, TN

Date Completed (Estimated): 4/24/2025

Contract Value: $5,851,340.00

Owner: Town of Oneida

Engineer: GRW Engineers, Inc.