PROJECT INFORMATION:
Location: Statesville, NC
Date Completed (Estimated): November 2025
Contract Value of $2,886,200.00
Owner: City of Statesville, NC
Engineer: McGill Associates, PA
Viewing entries by
JODI SMITH
Location: Statesville, NC
Date Completed (Estimated): November 2025
Contract Value of $2,886,200.00
Owner: City of Statesville, NC
Engineer: McGill Associates, PA
The Oakland Wastewater Treatment Plant capacity expansion consists of construction of two new sequencing batch reactors (SBR), sludge digester, new headworks, new splitter box, and new effluent pumps. Additionally, portions of the plant will be renovated including the existing sequencing batch reactor (SBR) and sludge digester.
Construction of new sequencing batch reactor (SBR)
Requiring a 204’x114’ excavation, 24’ deep
Increasing the facilities capacity by 2-2.6 million gallons
Construction of new sludge digester; requiring a 140’ cylindrical excavation, 27’ deep
Renovation of existing SBR and sludge digester; including equipment, piping, instrumentation and electrical
Location: Oakland, TN
Date Completed (Estimated): February, 2026
Contract Value of $28,700,000.
Owner: Town of Oakland
Engineer: J.R. Wauford & Company, Consulting Engineers, Inc.
JCC will be required to keep the existing facilities in full operation during the construction period.
The importance of maintaining the flow in the existing sanitary sewer lines is paramount.
New Secondary Clarifier
New Fine Screen System
Addition of second Chlorine Contact Basin with new flow division box and piping to route flow to both chlorine contact basins
Converting existing influent pump station wetwell into a submersible pump station with
wall mounted influent grinder
Addition of RAS pumps and piping in blower/sludge building
Location: Baxter, TN
Date Completed (Estimated): February, 2026
Contract Value of $3,284,000.00
Owner: Town of Baxter
Engineer: Bennett Associates, Inc.
New Chlorine Contact Chamber
New Mechanical Floating Aerators
New Clarifier Spray System
New Ultrasonic Flowmeter and Precast Vault
Location: Jasper, TN
Date Completed (Estimated): April, 2025
Contract Value of $2,477,000.00
Owner: Town of Jasper
Engineer: Croy Engineering, LLC.
Roofing replacement for 3ea ATAD Reactor Tanks
Existing Roof & Parapet Demo
Concrete Parapet Replacement
Roof Balanst Slab
EPDM Roofing Replacement
Location: Lebanon Wastewater Treatment Plant, Lebanon TN
Date Completed (Estimated): November 2024
Contract Value of $962,000.00
Owner: City of Lebanon
Engineer: Water Management Services
Location Reidsville, NC
Date Completed (Estimated): March 2025
Contract Value of $4,307,000.00
Owner: City of Reidsville, NC
Engineer: McGill Associates, PA
Excavation and Dewatering
Overcoming Challenging Ground Water
Headworks Screening Chamber Concrete Work.
Replacement of headworks equipment
All pumps and Valves have been replaced and successfully started-up at the Hillcrest Pumping Station. JCC has completely excavated to subgrade and completely poured the foundation slab for the clearwell structure and the lower exterior wall below the intermediate construction joint. JCC has drilled for and installed 70 l.f. of the 24” Clearwell Influent line. JCC is currently working on poring the remainder of the exterior walls above the intermediate construction joint, as well as the interior walls inside the clearwell.
Building a new Clearwell structure
Yard piping
Installing four new high service pumps
Replacing pumps at the Hillcrest Pumping Station
Location: Springfield, TN
Date Completed (Estimated): September 9th, 2025.
Contract Value: $10,870,750.00
Owner: City of Springfield, Tennessee
Engineer: Griggs & Maloney
The Junction Pump Station Rehabilitation project in Eden, NC is the rehabilitation and upgrade of an existing pump station. The improvements include converting the existing pumps to direct- coupled variable frequency drive submersible motor pumps, replacement of existing piping and valves, and installation of an emergency pump connection for current & future pump station bypass. In addition, the existing wet well will be inspected, cleaned, and coated with a high- performance coating. Electrical improvements include elevating the electrical controls, installation of an automatic transfer switch and installing a permanent generator on an elevated platform supported on micro-piles. General site improvements include installation of an earthen berm, gravel road, concrete sidewalk extension, and cattle wire fence removal; relocation. Overcoming Challenges Presented – JCC Crew worked the unexpected challenges of water backpressure from the WWTP to install the pump station bypass line to complete a planned shutdown working through the challenges presented for a successful installation.
Location: Eden, NC
Date Completed: July 25, 2024
Contract Value of $5,971,798.46
Owner: City of Eden
Engineer: W.K. Dickson
Facility Start-Up & Final Completion
Successful Completion of Pump Station Rehabilitation in 40 Days
Bypass pumping operations completed 2 months ahead of schedule.
The Kingsport WTP HSPS project consists of installation of large diameter underground ductile iron pipe and construction of a new High Service Pump Station to include a new Electrical Room to contain the major electrical components as well as a new Pump Room where the new High Service Pump No. 4 will be installed with a 20-ft deep steel suction shaft fully encased in concrete. This project also requires improvements to the existing High Service Pump Station where an additional concrete influent vault will be constructed against the existing structure to receive flow from the new underground ductile iron pipe. Additionally, the existing High Service Pumps No. 1-3 will receive new variable frequency controllers. Finally, the existing electrical switchboard will be replaced with a new motor control center within the new Electrical Room.
42” and 36” Ductile Iron Pipe
Construction of 20-ft deep shaft for new High Service Pump No. 4
Construction of new Vault at existing High Service Pump Station
Construction of new High Service Pump Station
Installation of new High Service Pump No. 4
Installation of new MCC and VFDs
Demolition of existing electrical switchboard
Location: Kingsport, TN
Date Completed (Estimated): 8/12/2025
Contract Value: $7,994,000.00
Owner: City of Kingsport
Engineer: CDM Smith
Construction of a 16,000-sf new medical office and rehab facility with an 1,800-sf enclosed connecting bridge.
Location: Cookeville, TN
Date Completed (Estimated): May 2025
Contract Value: 6.5MM
Owner: Cookeville Cardiovascular Realty
Designer: AEI
Water Treatment Plant addition of Sedimentation/Flocculation Basin, Sludge Pump Station, modifications to existing raw water basins; meter vault, 16” raw water line, 8” basin drain line, 2'“ water line Major Activities: Cast-in-place concrete for sedimentation basin. Process piping ductile iron pipe and valves. Yard piping ductile iron pipe and valves. Tube settlers and trough system. Mechanical flash mixers. Vertical paddle flocculation equipment. Submersible feedwater pumps. Sludge pump station. Adjustable speed submersible mixers. Stainless steel gates. New electrical building. Instrumentation and Control for sedimentation basin. Upgrade to existing PLC.
Location: Oneida, TN
Date Completed (Estimated): 4/24/2025
Contract Value: $5,851,340.00
Owner: Town of Oneida
Engineer: GRW Engineers, Inc.
Pump Station Rehabilitation
Major Activities:
- Replacement of existing pumps, piping, motors, motor shafts, valves, VFDs, control panels, generator
- Demolition, removal, installation and modifications of existing concrete
- Addition of odor control system
Notable Specs:
Pump station will be bypassed during replacement of pumps and other construction activities. This force main that feeds the pump station is the main feed of the Nissan Plant located in Smyrna Tennessee.
Location: Smyrna, TN
Date Completed (Estimated): October 2024
Contract Value: $4,271,000.00
Owner: Town of Smyrna
Engineer: Thomas and Hutton
Installation of septage receiving station for offloading of septage/sludge haulers
Replacement or demolition of existing aeration basins equipment including mixers and mixer structures, diffusers, installation of a new baffle curtain system, and installation of a new blower.
Location: Lebanon, TN
Completion Date (Estimated): November 2023
Contract Value $2,041,500
Owner: City of Lebanon Utilities District
Engineer: Water Management Services, LLC
- Maintain facility operation while dewatering and replacing equipment within (2) aeration basins during regional dry season
New 8,600 square foot pre-engineered metal building addition with 2 each new cast in place concrete tanks and foundation work for future Ball Mill.
Location: Crossville, TN
Completion Date: January 2024
Contract Value $2.4
Owner: Crossville Ceramics, Inc
Engineer: Bouton Engineering
New building has 55’-0” heights.
Timberwalk Subdivision is a 292 lot subdivision development in Cookeville TN. Major activities include grading, utility installation, HOA/Community, pool, parks and buildings, etc.. streets, city sewer infrastructure extension.
Location: Cookeville, TN
Date Completed (Estimated): October 2025
Contract Value of $13,101,200
Owner: Titan Development
Engineer: Clinton Engineering
The project includes removal of the existing 500 gpm submersible pumps and replacement with new 1,000 gpm submersible pumps including associated piping, valves, and appurtenances (electrical equipment, electrical control rack, generator, instrumentation, bypass pumping and connection etc.).
Location: Smithfield, NC
Date Completed (Estimated): September 2023
Contract Value of $1,520,000
Owner: Johnston County Public Utilities
Engineer: CDM Smith
New pumps, piping, valves, precast, interior wet well lining, new fencing, and electrical.
Major Activities: Wet Well Interior Lining System
Location: Lewisburg, TN
Date Completed (Estimated): 2-10-24
Contract Value: $499,000
Owner: City of Lewisburg, TN
Engineer: Wauford