The Kingsport WTP HSPS project consists of installation of large diameter underground ductile iron pipe and construction of a new High Service Pump Station to include a new “Electrical Room” to contain the major electrical components as well as a new “Pump Room” where the new High Service Pump No. 4 will be installed with a 20-ft deep steel suction shaft fully encased in concrete. This project also requires improvements to the existing High Service Pump Station where an additional concrete influent vault will be constructed against the existing structure to receive flow from the new underground ductile iron pipe. Additionally, the existing High Service Pumps No. 1-3 will receive new variable frequency controllers. Finally, the existing electrical switchboard will be replaced with a new motor control center within the new Electrical Room.
Major Activities:
Dig, Lay, Bury 42” and 36” Ductile Iron Pipe
Construction of 20-ft deep shaft for new High Service Pump No. 4
Construction of new Vault at existing High Service Pump Station
Construction of new High Service Pump Station
Installation of new High Service Pump No. 4
Installation of new MCC and VFDs
Demolition of existing electrical switchboard
Project Specs:
Location: Kingsport, TN
Date Completed (Estimated): 8/12/2025
Contract Value: $7,994,000.00
Owner: City of Kingsport
Engineer: CDM Smith