J Cumby Construction, Inc., will be responsible for the removal of three mechanical bar screens and the installation of four (4) new multi-rake style mechanical bar screens in the same channels plus one in the manual bar screen channel.
There will also be Demolition of existing screening compactors and installations of two belt conveyors for screenings removal to dumpster area, removal of grit influent and effluent manually operated isolation slide gates and replacement with electrically operated slide gates, as well as the installation of new grit train distribution channel isolation slide gate (with new electric actuator).
Additionally, there will be replacement of four influent bar screen isolation electric gate operators with new Contractor furnished operators, Installation of a new electrical equipment pad north of screen channels, demolition and replacement of two sodium hypochlorite storage tanks including demolition of the masonry knock-out walls and replacement with translucent wall panels, as well as the demolition and installation of new fine bubble diffuser grids in Aerated Sludge Storage Tank No. 3.
PROJECT INFORMATION:
Location: Fayetteville, NC
Date Completed (Estimated): July, 2022
Contract Value of $2,430,000
Owner: Fayetteville Public Works Commission, City of Fayetteville
Engineer: Hazen and Sawyer
NOTABLE SPECS:
This project improves the Liquids Train of Rockfish WRF
This project improves the Solids Train of Rockfish WRF