J. Cumby will be upgrading an existing wastewater treatment plant that currently treats 0.9 million gallons of wastewater per day.
Major Activities:
Expanding the existing facility’s control building by 2,310 sf
This includes an addition of (3) rooms:
-Chemical Feed – Currently in a separate building that will be demolished during this project
-Electrical & Control Room – Moving existing MCC & controls from a different area of the existing control building
-Open space
Renovations and additions to the facilities electrical services
Generator, motor control center, lighting, wiring
Demolition and removal of (2) existing sequencing batch reactor (SBR) systems
Installation of (2) new SBR systems
Blowers, decanters, analyzers, air supply lines, valves, connectors, pumps and instrumentation
Installation of new and modification of existing yard piping
Additional structural activities
New walkway canopy for the control building
Construction of a new structural steel canopy for the new blowers
PROJECT INFORMATION
Location: Morrison, TN
Date Completed (Estimated): December, 2023
Contract Value of $3,863,859.77
Owner: West Warren-Viola Utility District
Engineer: James C. Hailey & Company
NOTABLE SPECS
Because this is a renovation to an operating facility, one of the two SBR basins must remain in service throughout construction. Sequencing of the equipment installation will require a staggered installation for each of the basins, rather than concurrent installation typical to new construction.