This project includes new construction of two SBR tanks and rehabilitation of an existing steel tank for a completely new waste water treatment system for Moore County, Tennessee.
Projects
Viewing entries in
Water & Waste
This project includes new construction of two SBR tanks and rehabilitation of an existing steel tank for a completely new waste water treatment system for Moore County, Tennessee.
New construction of new cast-in-place SBR Basin & Digester and all associated piping & pumps to provide new waste water treatment system for the City of Greenbrier, Tennessee.
New construction of Raw Water Intake and Pump Station to bring water to the treatment plant for processing into potable water.
New 5,000,000 gallon sewer overflow tank with detached electrical building and all associated piping.
Construction of a new sewer pump station for the city of Decatur, AL.
The Terris Tatum project in Madison, AL consists of a new raw water intake and pumping station on the Tennessee River.
This Water Treatment Plant Improvements project consists of a new sodium hypochlorite building and sodium hypochlorite system used to treat water prior to distribution to residents of Rutherford County, TN.
A new submersible sewage pump station located on the same sites as the existing Mayberry Street lift station, South Carter Street lift station, and Turn Table Road lift station.
This addition includes a new Sodium Hypochlorite Feed Building and a 5,500 square foot stand-alone structure with a major focus on the subsurface conditions.
This project included the installation of a new headworks structure and influent pump station. The main challenge of this project was the dewatering need for construction.
This project involved new influent headworks, influent pump station, SDADA, metering system, disinfection structures, chemical feed systems, and a maintenance building.
This construction included a new oxidation ditch, flow equalization and RAS pump stations, chlorine analyzer, laboratory building, sludge bed modifications and more.